Public Registry

Rules for the conduct of proceedings before the Board are set out in the Rules of Procedure.

Archives 

You can sign up to receive email notification as documents are added to the public registry. Please note that notification is given only once at the end of each day.

Current Proceedings:

On July 17, 2026, Environment & Climate Change (ECC), Government of the Northwest Territories (GNWT) and Tłı̨chǫ Government (TG) submitted a joint management proposal, entitled Joint Proposal on Management Actions for the Bluenose-East Barren-ground Caribou (Sahtì Ekwǫ̀) Herd 2027-2030(“the Proposal”) to the WRRB, outlining proposed management actions for Sahtì Ekwǫ̀ in Wek’èezhìı. Following an initial assessment of the Proposal, the WRRB determined that a Level 2 review is appropriate, as per its Rule for Management Proposals. The Board opened the 2026 Sahtì Ekwǫ̀ Management Proceeding on August 27, 2026. Public participation in this WRRB proceeding is encouraged in accordance with the Board’s Rules. 

Latest Documents

PR (BNE 2026): 008 - Use of Distance and Double Observer Sampling Applied to Barren-ground Caribou Calving Ground Visual Survey Estimates

This DRAFT report describes the methods and results of using a distance sampling component in addition to the double observer (mark-recapture) visual survey methods during the 2025 calving ground survey of the Bluenose-East barren-ground caribou herd. This DRAFT report provides additional information important for the June 2025 Calving Ground Survey and 2025 Population Modelling of the Bluenose-East Barrenground Caribou Herd DRAFT report.

Please note that this is a draft version. The report will be finalized as a manuscript report in the coming weeks and subsequently posted publicly in accordance with ECC processes. To ensure this is clear, a watermark is included as well as a disclaimer on the front page indicating that there may be changes between this draft and the final manuscript report. These changes are not expected to be substantial but may include updates to formatting, figures, tables, and other minor details.

Science
PR (BNE 2026): 007 - June 2025 Calving Ground Survey and 2025 Population Modelling of the Bluenose-East Barrenground Caribou Herd

This DRAFT report describes the methods and results of a calving ground survey of the Bluenose-East barren-ground caribou herd conducted June 3-15, 2025, west of Kugluktuk, Nunavut. It updates abundance estimates of the herd from the calving ground survey results and integrated population models.

Please note that this is a draft version. The report will be finalized as a manuscript report in the coming weeks and subsequently posted publicly in accordance with ECC processes. To ensure this is clear, a watermark is included as well as a disclaimer on the front page indicating that there may be changes between this draft and the final manuscript report. These changes are not expected to be substantial but may include updates to formatting, figures, tables, and other minor details.

Science
PR (BNE 2026): 006 - WRRB REVISED Work Plan for the 2026 Sahtì (Bluenose-East) Ekwǫ̀ Management Proceeding

This is a revised work plan for the WRRB's 2026 Sahtì Ekwǫ̀ Management Proceeding, as of September 4, 2026.

General
PR (BNE 2026): 005 - WRRB REVISED Notice of Proceeding & Proceeding Schedule for the 2026 Sahtì (Bluenose-East) Ekwǫ̀ Management Proceeding

This is a revised notice of proceeding and proceeding schedule for the WRRB's 2026 Sahtì Ekwǫ̀ Management Proceeding, as of September 4, 2026.

Schedule
PR (BNE 2026): 004 - WRRB Work Plan for the 2026 Sahtì (Bluenose-East) Ekwǫ̀ Management Proceeding

This is a work plan for the WRRB's 2026 Sahtì Ekwǫ̀ Management Proceeding.

General
PR (BNE 2026): 003 - WRRB Notice of Proceeding & Proceeding Schedule for the 2026 Sahtì (Bluenose-East) Ekwǫ̀ Management Proceeding

This is a notice of proceeding and proceeding schedule for the WRRB's 2026 Sahtì Ekwǫ̀ Management Proceeding.

Schedule
PR (BNE 2026): 002 - WRRB Response to TG-GNWT to Joint Management Proposal for Sahtì (Bluenose-East) Ekwǫ̀ Herd

This is a letter from the WRRB to TG-GNWT indicating that the Board has determined to undertake a Level 2 review (Motion #1042-16-08-2026) for the Joint Proposal on Management Actions for the Bluenose-East Barren-ground Caribou (Sahtì Ekwǫ̀) Herd 2027-2030. As such, the Board has opened the 2026 Sahtì Ekwǫ̀ Management Proceeding on August 27, 2026.

Correspondence
, , , , PR (BNE 2026): 001 - Joint Proposal on Management Actions for the Bluenose-East Barren-ground caribou (Sahtì ekwǫ̀) Herd 2027 – 2030

This is a cover letter and joint management proposal with Appendices A-C submitted to the WRRB from TG and GNWT, entitled "Joint Proposal on Management Actions for the Bluenose-East Barren-ground Caribou (Sahtì Ekwǫ̀) Herd 2027-2030".

Proposal